Engineered Construction System
ACEGEO™

Lightweight Geotechnical Fill

A sustainable alternative to EPS geofoam and traditional quarried fill.

An engineered system, placed and compacted to the project specification.

Foam glass aggregate placed within a road construction siteConstruction applications
Engineering & technical resources

Get the details that inform the design.

Connect your project requirements with the right technical information. Ask for the current ACEGEO documentation before finalizing a specification.

What to confirm with ACE
Installed loadingReview load-bearing and lateral-load criteria for the compacted layer.
Saturated densityConfirm the in-place saturated design density.
Placement & confinementDefine lift thickness, geotextile encasement, and engineered section geometry.
Compaction & testingConfirm compaction method, achieved unit weight, and field verification.
SubmittalsRequest system details, installation controls, and acceptance criteria.
Any system performance commitment is subject to approved design, specified installation, field verification, acceptance criteria, and written project terms. Current approved data must be confirmed with ACE before specification.
From specification to supply

Let’s build something together.

Request a quote or samples, schedule a lunch & learn, discuss a project, or connect with our technical team.

Tell us about your project